英语翻译用翻译软件或胡乱粘贴的请勿回答,以下是风险评估的方法:Plan additional risk reductio
来源:学生作业帮 编辑:作业帮 分类:英语作业 时间:2024/10/07 02:15:30
英语翻译
用翻译软件或胡乱粘贴的请勿回答,
以下是风险评估的方法:
Plan additional risk reduction measures for risk level “Medium 3” or more
Determine the residual risk
Assign responsible person / party for taking action
Review adequacy of action plan – confirm whether the risks are tolerable
Evaluate and analyse performance of controls
Monitor changing conditions and practices
Apply the lessons learned
Ensure risk assessment and controls are effective and up-to-date
File completed Risk Assessment
用翻译软件或胡乱粘贴的请勿回答,
以下是风险评估的方法:
Plan additional risk reduction measures for risk level “Medium 3” or more
Determine the residual risk
Assign responsible person / party for taking action
Review adequacy of action plan – confirm whether the risks are tolerable
Evaluate and analyse performance of controls
Monitor changing conditions and practices
Apply the lessons learned
Ensure risk assessment and controls are effective and up-to-date
File completed Risk Assessment
对风险级别为“中”(3)或以上的,为其策划附加降低风险措施确定剩余风险指定采取行动的负责人/负责方审查行动计划是否适足 - 确认风险是否可接受评估及分析控制的绩效监控具变化的情况和做法应用课堂所学来的确保风险评估及控制是有效的及最新的完成的风险评估档案
原文如下:Plan additional risk reduction measures for risk level “Medium 3” or moreDetermine the residual risk Assign responsible person / party for taking action Review adequacy of action plan – confirm whether the risks are tolerableEvaluate and analyse performance of controlsMonitor changing conditions and practicesApply the lessons learnedEnsure risk assessment and controls are effective and up-to-dateFile completed Risk Assessment
~~~~~~~~~~全人手翻译,欢迎采纳~~~~~~~~~~
原文如下:Plan additional risk reduction measures for risk level “Medium 3” or moreDetermine the residual risk Assign responsible person / party for taking action Review adequacy of action plan – confirm whether the risks are tolerableEvaluate and analyse performance of controlsMonitor changing conditions and practicesApply the lessons learnedEnsure risk assessment and controls are effective and up-to-dateFile completed Risk Assessment
~~~~~~~~~~全人手翻译,欢迎采纳~~~~~~~~~~
英语翻译用翻译软件或胡乱粘贴的请勿回答,严重性:Slightly Harmful (Any failure that d
英语翻译用翻译软件或胡乱粘贴的请勿回答,有些单词可能连在一起了,注意区分~Applicable to any type
英语翻译用翻译软件或胡乱粘贴的请勿回答,这是有关能源的,有些专业词汇很不会翻,所以希望能帮我翻清楚!还有下面的上锁挂牌是
英语翻译胡乱粘贴或用翻译软件的请不要回答,Where and when it becomes necessary to
英语翻译胡乱粘贴或者用翻译软件的请不要回答,The following are types of work consid
英语翻译胡乱粘贴和用翻译软件的请不要回答,专业名词不知道可以不翻~· importance of lock-outs/t
英语翻译胡乱粘贴和用翻译软件的请不要回答,专业名词不知道可以不翻~Once the responsible office
英语翻译胡乱粘贴和用翻译软件的请不要回答,专业名词不知道可以不翻~Turn off power at machine f
英语翻译胡乱粘贴和用翻译软件的请不要回答,专业名词不知道可以不翻~Where lock-out is not possi
英语翻译胡乱粘贴和用翻译软件的请不要回答,专业名词不知道可以不翻~A lock-out system may be in
英语翻译用翻译软件和胡乱粘贴的请不要回答,这段话背景是讲电路作业的介绍,它包括什么什么什么.(前文大致讲 电路作业包括…
英语翻译请勿用翻译软件!