英语翻译SWL(SAFE WORKING LOAD)OF DERRICK/CRANE:2X10TONSCARGO ARR

来源:学生作业帮 编辑:作业帮 分类:数学作业 时间:2024/08/28 08:03:30
英语翻译
SWL(SAFE WORKING LOAD)OF DERRICK/CRANE:2X10TONS
CARGO ARRANGEMENTS
UNMBER OF MANIFOLDS ON EACH SIDE.3
TYPE OF MANIFOLD.STEEL
DISTANCE BOW TO CENTER MANIFOLD.114.0M
DISTANCE DECK TO CENTER MANIFOLD.1800MM
DISTANCE RAIL TO MANIFOLD.4.60M
NUMBER/SIZE OF REDUCERS.3(400-200MM) 4(300-250MM) 2(250-200MM) 1(250-150MM) 1(200-150MM)
NO.OF NATURAL SEGREGATIONS.3
PUMPS
PUMPS.PUMPROOM
NUMBER OF CARGO PUMPS.3
CAPACTTY OF CARGO PUMPS IN M3 WATER/HOUR:2000M3/HR EACH
MOORING ARRANGEMENTS
NUMBER AND BRAKE HOLDING POWER OF WINCHES:6X45TONS
NUMBER/LENGTH/DIAMETER OF MOORING WIRES:N/A
BREAKING STRENGTH OF WIRES.N/A
NUMBER/LENGTH/DIAMETER OF MOORING ROPES:16/250M/75MM
BREAKING STRENGTH OF MOORING ROPES.61.2TONS
IS VESSEL EQUIPPED ACCORDING TO OCIMFS
STANDARDS FOR SPM (SINGLE POINT MOORING)?:YES
CLASSIFICATION SOCIETY,SURVEYS AND CERTIFICATES
VESSEL'S CLASSIFICATION SOCIETY.NKK
LAST SPS (SPECIAL PERIODICAL SURVEY).JULY 2001
LAST DRYDOCKING.JULY 2001
LAST AGS(ANNUAL GENERAL SURVEY).DECEMBER 2001
OWNERS WARRANT FOLLOWING CERTIFICATES TO
BE VALID THROUGHOUT THE CHARTER PARTY
PERIOD:
LOAD LINE.24/04/2001
SOLAS SAFETY EQUIPMENT.24/04/2001
SOLAS SAFETY CONSTRUCTION.24/04/2001
吊杆/克令吊的安全工作负荷:2X10吨
货物装置
每一边的(油管路,阀箱)的数量.3
(油管,阀箱)类型.铁
船头到中间(油管,阀箱)距离.114米
甲板到中间(油管,阀箱)距离.1800毫米
栏杆到(油管,阀箱)距离...4.6米
减压器数量/尺寸...3(400-200MM) 4(300-250MM) 2(250-200MM) 1(250-150MM) 1(200-150MM)
自然隔离数量.3

泵...泵间
货物泵数量...3
货物泵承载量,单位立方米水/小时.每个泵2000立方/小时
系泊装置
缆车的数量和刹车制动拉力:6X45吨
钢丝缆的数量/长度/直径:未配备
钢丝缆破断强度.未配备
缆绳的数量/长度/直径:16/250M/75MM
缆绳的破断强度.61.2吨
船舶是否根据OCIMFS 标准配备了单点系泊?:是
船级,检验和证书
船舶船级.NKK
上次特别期间检验.2001 年7月
上次上坞.2001 年7月
上次年度检验).2001 年11月
在租期内,船东保证下列证书有效期内:
载重线证书.24/04/2001
SOLAS设备安全证书.24/04/2001
SOLAS 构造安全证书.24/04/2001
CAPTAIN WANG