作业帮 > 综合 > 作业

MATLAB报错!At time 0.002706477374972747,simulation hits (1000)

来源:学生作业帮 编辑:作业帮 分类:综合作业 时间:2024/11/05 18:37:05
MATLAB报错!
At time 0.002706477374972747,simulation hits (1000) consecutive zero crossings.Consecutive zero crossings will slow down the simulation.A report is shown below.You may increase the number of consecutive zero crossings allowed in the solver diagnostic controls to continue the simulation and ignore this message or disable the zero crossing detection of some of the blocks to accelerate the simulation.
为什么会出现这种问题?怎样才能改正?
出现连续零点(1000个),应该是已经达到某种状态了.你的模块中包括了有过零检验的模块,分别打开将过零检验项勾掉(好像是hit cross项).