作业帮 > 综合 > 作业

英语翻译NO1-7货仓部份区域钢板割换工程及仓盖修理,机仓风机2台修理工程,部份泵浦电机修理工程,锅炉工程,3号付机修理

来源:学生作业帮 编辑:作业帮 分类:综合作业 时间:2024/07/08 05:53:52
英语翻译
NO1-7货仓部份区域钢板割换工程及仓盖修理,机仓风机2台修理工程,部份泵浦电机修理工程,锅炉工程,3号付机修理工程,机仓部份加热器,冷却器修理工程,空气瓶伐修理,压载泵及其它泵浦修理工程,甲板,机仓,管系及伐修理工程,救生艇,舷梯修理工程,锚机缆机相关修理工程,舵轴承测量,尾轴封换新,机仓各出海伐修理,锚链标记马克,外壳打砂油漆工程.
NO1-part7The warehouse part area in engineering and warehouse cut steel plate cover repairs,engine room 2 sets repair engineering,fan part of the pump motor repair engineering,engineering,3 boiler pay repair engineering,machine machine part,cooler storehouse heater repair engineering,air bottles cut repair,ballast pump and other pump repair engineering,the deck,machine storehouse,tube system and cut repair engineering,the lifeboat,the ramp repair engineering machine,anchor cable machine related repair work,rudder bearing measurement,tail shaft seal change new,engine room to cut the repair,chain mark mark,shell play sand paint engineering.