英语翻译For outage management in electricity networks,the use of
来源:学生作业帮 编辑:作业帮 分类:英语作业 时间:2024/07/03 10:04:41
英语翻译
For outage management in electricity networks,the use of BEVs/PHEVs to generate power during outage restoration stage is envisioned by solving a multi-objective optimization problem of merit-order scheduling of BEV/PHEVs under operating constraints; 不要网上的翻译工具.
For outage management in electricity networks,the use of BEVs/PHEVs to generate power during outage restoration stage is envisioned by solving a multi-objective optimization problem of merit-order scheduling of BEV/PHEVs under operating constraints; 不要网上的翻译工具.
在电网断电管理中,我们期望在运作受到限制的断电期间,可以有效地用BEVs/PHEVs发电,并能够为BEVs/PHEVs的发电供电制订多任务优先顺序.(也就是BEVs/PHEVs发电期间优先需要供电的对象之类的.)
英语翻译For outage management in electricity networks,the use of
英语翻译Earnings management is the management of enterprises in
英语翻译British social networks in the 17th centuryI bet you use
英语翻译Notwithstanding the use of separate contracts for in cou
英语翻译INDICATIONS FOR USE:SILGEL is for management of Keloid a
With the use of electricity,great changes have come about in
英语翻译office of the for human resource management certificatio
英语翻译Reactive semicokes (char) for the use in a number of ind
英语翻译Metal scavengers suitable for use in the treatment of wa
英语翻译The use of TCP/IP for Real-time Messages in ATLAS Trigge
英语翻译46% of the products deliveries for use in production wer
英语翻译Sustainable management and use of natural resources at t