英语翻译施工技术措施各分项装修工程施工前,均应编制相应的施工技术措施,其内容包括:⑴施工准备、操作工艺、质量标准、成品保
来源:学生作业帮 编辑:作业帮 分类:综合作业 时间:2024/11/08 05:58:22
英语翻译
施工技术措施
各分项装修工程施工前,均应编制相应的施工技术措施,其内容包括:
⑴施工准备、操作工艺、质量标准、成品保护、安全防护.
⑵为了保证内外装修工程的质量,措施中要高标准严要求
样板
每项装饰施工前都要先做样板及样板间,经业主、监理等各方共同检查认可后方可进行大面积施工,以保证施工成品优良.
施工配合
施工前预先完成与之交叉配合的水、暖、电、卫等的安装,不得事后打洞,尤其注意的是吊顶内的安装未完成前,不得进行顶棚施工.
⑴对进场的装饰材料进行严格的检查验收,不合格材料不得进场,以确保装饰工程的质量.
⑵严格按施工验收规范和操作规程施工.
施工技术措施
各分项装修工程施工前,均应编制相应的施工技术措施,其内容包括:
⑴施工准备、操作工艺、质量标准、成品保护、安全防护.
⑵为了保证内外装修工程的质量,措施中要高标准严要求
样板
每项装饰施工前都要先做样板及样板间,经业主、监理等各方共同检查认可后方可进行大面积施工,以保证施工成品优良.
施工配合
施工前预先完成与之交叉配合的水、暖、电、卫等的安装,不得事后打洞,尤其注意的是吊顶内的安装未完成前,不得进行顶棚施工.
⑴对进场的装饰材料进行严格的检查验收,不合格材料不得进场,以确保装饰工程的质量.
⑵严格按施工验收规范和操作规程施工.
Construction technical measures
The breakdown of the renovation work,should be the preparation of the construction of technical measures,which include:
⑴ to prepare the construction,operation process,quality standards,product protection,security protection.
⑵ In order to ensure the quality of internal and external decoration,and measures to high standards and strict requirements.
Model
Each decoration must be pre-construction and the first prototype model,by the owner,supervision,and other parties to jointly carry out checks approved before large-scale construction in order to ensure construction quality products.
Construction fit
In advance of construction with the completion of the cross with water,heating,electricity,health,and so the installation may not post holes,particularly the installation of the ceiling prior to the completion of roof construction is not permitted.
The process of screening
⑴ approach of the decorative materials to carry out strict check and acceptance,not allowed to enter the substandard materials in order to ensure the quality of decoration.
⑵ construction in strict accordance with accepted norms and rules of construction.
The breakdown of the renovation work,should be the preparation of the construction of technical measures,which include:
⑴ to prepare the construction,operation process,quality standards,product protection,security protection.
⑵ In order to ensure the quality of internal and external decoration,and measures to high standards and strict requirements.
Model
Each decoration must be pre-construction and the first prototype model,by the owner,supervision,and other parties to jointly carry out checks approved before large-scale construction in order to ensure construction quality products.
Construction fit
In advance of construction with the completion of the cross with water,heating,electricity,health,and so the installation may not post holes,particularly the installation of the ceiling prior to the completion of roof construction is not permitted.
The process of screening
⑴ approach of the decorative materials to carry out strict check and acceptance,not allowed to enter the substandard materials in order to ensure the quality of decoration.
⑵ construction in strict accordance with accepted norms and rules of construction.
英语翻译施工技术措施各分项装修工程施工前,均应编制相应的施工技术措施,其内容包括:⑴施工准备、操作工艺、质量标准、成品保
炎热天气大体积混凝土施工应采取哪些技术措施
审查施工承包单位编制的专项安全施工方案应包括哪些内容
大体积混凝土的定义?及施工温控技术措施?
谁能帮我解释一下施工技术措施费和施工组织措施费是什么意思呢?谢谢啦
审计报告中译英-存货工程施工以实际成本核算,包括直接材料费、直接人工费、施工机械费、分包费用、其他直接费及应分配的施工间
求问建筑工程模板施工方案的编制内容包括哪些?
装修施工过程中应采取下列成品和半成品保护措施有哪些?
英语翻译1.一般要求(1)用于工程施工的一切施工机械,必须类型齐全、配套完整、并与施工质量和进度相适应,其机械状况应能满
顶管施工方案应包括哪些内容?(多选)
浙江新的10定额 综合单价中包含脚手架搭拆费、高层增加费、超高增加费等施工技术措施费吗?
英语翻译摘要:本文介绍工具式超高单侧支模技术在天津站改扩建工程中的应用,并介绍了改技术的工艺特点,施工要点,质量标准,安